…would have been nice to have had installed on Friday. The contractor had told me his crew would do it Friday, but that was also the third or fourth time he’d scheduled this job and then postponed it. The main activity is to be grading work on the side of the house to prevent moisture damage under the house. Remarkably, the contractor doesn’t think I’ve sustained any significant moisture damage despite having the excuse for a gutter that you can see below. I’ve watched this incomplete, broken gutter sustain dozens of downpours over the last four years. This should be the last.